Top 10 Building
in Fairfield East, Parramatta
TradeRefer lists 4 verified building businesses in Fairfield East with an average Google rating of 3.5★ across 10 reviews. The businesses below are ranked from highest to lowest rating — all ABN-verified and community-recommended.
Ranked #2026
By Google Rating
3.5★ Avg Rating
10 reviews
100% Verified
ABN-checked
Top 4 Building in Fairfield East — Ranked by Rating
Sorted by verified Google rating, highest first. All ABN-verified.

Zaia Building
Zaia Building are the leaders in Sydney home renovations, concreting, kitchens, bathrooms and commercial renovating and retail fit outs.

Luxury building Products
Where Building Meets ArtistiqueDesign Elevating your projects to new heights We choose the best way to surpass our customers expectations. It mean always going above and beyond to provide a…

KOCHA1 construction PTY LTD
KOCHA1 construction PTY LTD offers building and construction for new homes, renovations, and extensions in Fairfield East, NSW. With 4 customer reviews and a focus on quality workmanship, they serve homes and businesses across the Fairfield East area. Contact KOCHA1 construction PTY LTD for a free quote.

Bob Building Construction Management Pty Ltd
Bob Building Construction Management Pty Ltd is a trusted building business serving Fairfield East and surrounding areas in NSW. Contact Bob Building Construction Management Pty Ltd today — call +61 2 8519 4891 for a free quote.
How Much Do Building Cost in Fairfield East?
Based on New South Wales industry rates. Always get 2–3 written quotes.
Typical Range
$80–$160
/hr
After-Hours
$240
Emergency callout
Avg Hourly
$120
Fairfield East market
Estimates only. Always request a written quote before authorising work.
Building Licensing in New South Wales
In NSW, builders must hold a contractor licence from NSW Fair Trading. Home building work over $20,000 requires home building compensation insurance.
How to Choose the Best Building in Fairfield East
A checklist before hiring any building in Fairfield East, Parramatta.
- 1
Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).
- 2
Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.
- 3
Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.
- 4
Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.
- 5
Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.
FAQs — Building in Fairfield East, Parramatta
How much does a home extension cost in Australia?
A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.
Do I need council approval for a home extension?
Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.
What is the difference between a builder and an architect?
An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.
How long does a granny flat take to build in Australia?
A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.
What should a building contract include?
A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.
Top Building in Nearby Suburbs
Find ranked building in suburbs close to Fairfield East.
Are You a Building in Fairfield East?
Get listed on TradeRefer and rank in the top building for Fairfield East. Free to join.
List Your Business Free