Top 10 Building
in Dee Why, Sydney
TradeRefer lists 5 building businesses in Dee Why with an average Google rating of 4.5★ across 127 reviews. The businesses below are ranked from highest to lowest rating — all ABN-checked and community-recommended.
Ranked #2026
By Google Rating
4.5★ Avg Rating
127 reviews
ABN Checked
ABN-checked
Top 5 Building in Dee Why — Ranked by Rating
Sorted by public Google rating, highest first. All ABN-checked.

Faber Homes Pty Ltd
Luxury home and apartment renovations across Sydney's Northern Beaches & North Shore. Experience Italian craftsmanship in your next project.

Dependabuild: Northern Beaches Builders
Looking for Northern Beaches Builders? With Dependabuild, you can be guaranteed an experienced, organised & solution-based builder. Contact us today.

Custom Living Pty Ltd
Explore Custom Living

Your Style Designer Home Additions
Welcome Welcome to Your Style Designer Home Additions, the First Floor Addition Specialist, servicing Sydney’s Northern Beaches and Northern Suburbs.Your Style is a ‘design and construct’ building company situated in Dee Why. Phone our office and see how we can transform your home! find out more https://youtu.be/dzl2L5ido3w OUR PROCESS Your Style designs your additions, surveys

Bates Building Pty Ltd
Renovations Northern Beaches | From one room to multi storey builds and our team of craftsmen have the experience and skills to deliver exceptional results.
How Much Do Building Cost in Dee Why?
Based on New South Wales industry rates. Always get 2–3 written quotes.
Typical Range
$80–$160
/hr
After-Hours
$240
Emergency callout
Avg Hourly
$120
Dee Why market
Estimates only. Always request a written quote before authorising work.
Building Licensing in New South Wales
In NSW, builders must hold a contractor licence from NSW Fair Trading. Home building work over $20,000 requires home building compensation insurance.
How to Choose the Best Building in Dee Why
A checklist before hiring any building in Dee Why, Sydney.
- 1
Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).
- 2
Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.
- 3
Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.
- 4
Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.
- 5
Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.
FAQs — Building in Dee Why, Sydney
How much does a home extension cost in Australia?
A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.
Do I need council approval for a home extension?
Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.
What is the difference between a builder and an architect?
An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.
How long does a granny flat take to build in Australia?
A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.
What should a building contract include?
A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.
Top Building in Nearby Suburbs
Find ranked building in suburbs close to Dee Why.
Are You a Building in Dee Why?
Get listed on TradeRefer and rank in the top building for Dee Why. Free to join.
List Your Business Free