tradereferTRADEREFER
Ranked by Google Reviews

Top 10 Building
in Annerley, Brisbane

TradeRefer lists 3 building businesses in Annerley with an average Google rating of 4.9 across 56 reviews. The businesses below are ranked from highest to lowest rating — all ABN-checked and community-recommended.

Typical cost in Annerley: $80–$160/hr

Ranked #2026

By Google Rating

4.9★ Avg Rating

56 reviews

ABN Checked

ABN-checked

Top 3 Building in Annerley — Ranked by Rating

Sorted by public Google rating, highest first. All ABN-checked.

#1
Top Rated 2026
Lindon Homes
Building ABN checked

Lindon Homes

Lindon Homes has been building in South East Queensland for over 32 years. We know it takes passionate craftsmanship to build an exceptional home.

5.0(17 reviews)
Annerley
#2
Sager Projects Pty Ltd
Building ABN checked

Sager Projects Pty Ltd

Elevate your lifestyle with Bayside Custom Homes in Melbourne. Exceptional craftsmanship meets timeless design in a seamless build journey. Your path to a luxurious, energy-efficient home begins here. Explore...

5.0(13 reviews)
Annerley
#3
Stark Builders logoStark Builders
Building ABN checked

Stark Builders

Stark Builders is a top-rated building business serving Annerley, QLD. With a 4.8-star rating from 26 reviews, they are one of the most trusted building providers in the area. Specialising in building and construction for new homes, renovations, and extensions, Stark Builders delivers quality workmanship and reliable service. Contact them today for a free quote.

4.8(26 reviews)
Annerley

How Much Do Building Cost in Annerley?

Based on Queensland industry rates. Always get 2–3 written quotes.

Typical Range

$80–$160

/hr

After-Hours

$240

Emergency callout

Avg Hourly

$120

Annerley market

Estimates only. Always request a written quote before authorising work.

Building Licensing in Queensland

In Queensland, builders must hold a QBCC licence. Contracts over $3,300 must be in writing with mandatory cooling-off periods.

How to Choose the Best Building in Annerley

A checklist before hiring any building in Annerley, Brisbane.

  1. 1

    Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).

  2. 2

    Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.

  3. 3

    Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.

  4. 4

    Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.

  5. 5

    Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.

FAQs — Building in Annerley, Brisbane

How much does a home extension cost in Australia?

A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.

Do I need council approval for a home extension?

Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.

What is the difference between a builder and an architect?

An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.

How long does a granny flat take to build in Australia?

A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.

What should a building contract include?

A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.

Top Building in Nearby Suburbs

Find ranked building in suburbs close to Annerley.

Are You a Building in Annerley?

Get listed on TradeRefer and rank in the top building for Annerley. Free to join.

List Your Business Free
Last referral matched: Plumbing in Bondi 12 min ago