Top 10 Building
in Slacks Creek, Logan City
TradeRefer lists 3 building businesses in Slacks Creek with an average Google rating of 4.7★ across 37 reviews. The businesses below are ranked from highest to lowest rating — all ABN-checked and community-recommended.
Ranked #2026
By Google Rating
4.7★ Avg Rating
37 reviews
ABN Checked
ABN-checked
Top 3 Building in Slacks Creek — Ranked by Rating
Sorted by public Google rating, highest first. All ABN-checked.

Hawley Constructions
Hawley Constructions is a highly rated building business serving Slacks Creek and surrounding areas in QLD. With an outstanding 5-star rating from 6 customer reviews, they are one of the top-rated building providers in the area. Contact Hawley Constructions today — call +61 7 3808 4700 or visit their website for a free quote.

Aligned Building & Construction
Aligned Building & Construction is an innovative construction company based in South East Queensland. With their strong attention to detail and passion for building, Aligned is a market leader for bespoke housing projects.

Kongs Building Pro
Kongs Building Pro Delight your building with our talent and quality services. Our Services COMMERCIAL RENOVATIONS Prorate and tailor-made renovation styles will create a professional and reliable environment for both of you and your customers. Our renovation projects will never let you down. HOME RENOVATIONS A comfortable and relaxing renovation style will make your house […]
How Much Do Building Cost in Slacks Creek?
Based on Queensland industry rates. Always get 2–3 written quotes.
Typical Range
$80–$160
/hr
After-Hours
$240
Emergency callout
Avg Hourly
$120
Slacks Creek market
Estimates only. Always request a written quote before authorising work.
Building Licensing in Queensland
In Queensland, builders must hold a QBCC licence. Contracts over $3,300 must be in writing with mandatory cooling-off periods.
How to Choose the Best Building in Slacks Creek
A checklist before hiring any building in Slacks Creek, Logan City.
- 1
Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).
- 2
Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.
- 3
Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.
- 4
Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.
- 5
Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.
FAQs — Building in Slacks Creek, Logan City
How much does a home extension cost in Australia?
A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.
Do I need council approval for a home extension?
Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.
What is the difference between a builder and an architect?
An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.
How long does a granny flat take to build in Australia?
A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.
What should a building contract include?
A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.
Top Building in Nearby Suburbs
Find ranked building in suburbs close to Slacks Creek.
Are You a Building in Slacks Creek?
Get listed on TradeRefer and rank in the top building for Slacks Creek. Free to join.
List Your Business Free