tradereferTRADEREFER
Ranked by Google Reviews

Top 10 Building
in Kingston, Hobart

TradeRefer lists 3 building businesses in Kingston with an average Google rating of 3.9 across 40 reviews. The businesses below are ranked from highest to lowest rating — all ABN-checked and community-recommended.

Typical cost in Kingston: $80–$160/hr

Ranked #2026

By Google Rating

3.9★ Avg Rating

40 reviews

ABN Checked

ABN-checked

Top 3 Building in Kingston — Ranked by Rating

Sorted by public Google rating, highest first. All ABN-checked.

#1
Top Rated 2026
P A Dance Builders
Building ABN checked

P A Dance Builders

P A Dance Builders provides expert building and construction for new homes, renovations, and extensions in Kingston, TAS. Rated 4.4 stars by 12 customers, they are known for quality work and professional service. Get in touch with P A Dance Builders for a free, no-obligation quote.

4.4(12 reviews)
Kingston
#2
Building ABN checked

Wilson Homes - Kingston Display Home

Visit the Wilson Homes display home in Kingston, Tasmania today - Single storey Gordon 23 | Wilson Homes

4.1(15 reviews)
Kingston
#3
Maveric Builders PTY Ltd.
Building ABN checked

Maveric Builders PTY Ltd.

Maveric Builders PTY Ltd. offers building and construction for new homes, renovations, and extensions in Kingston, TAS. With 13 customer reviews and a focus on quality workmanship, they serve homes and businesses across the Kingston area. Contact Maveric Builders PTY Ltd. for a free quote.

3.2(13 reviews)
Kingston

How Much Do Building Cost in Kingston?

Based on Tasmania industry rates. Always get 2–3 written quotes.

Typical Range

$80–$160

/hr

After-Hours

$240

Emergency callout

Avg Hourly

$120

Kingston market

Estimates only. Always request a written quote before authorising work.

Building Licensing in Tasmania

In Tasmania, building practitioners must be registered under the Building Act 2016.

How to Choose the Best Building in Kingston

A checklist before hiring any building in Kingston, Hobart.

  1. 1

    Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).

  2. 2

    Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.

  3. 3

    Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.

  4. 4

    Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.

  5. 5

    Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.

FAQs — Building in Kingston, Hobart

How much does a home extension cost in Australia?

A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.

Do I need council approval for a home extension?

Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.

What is the difference between a builder and an architect?

An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.

How long does a granny flat take to build in Australia?

A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.

What should a building contract include?

A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.

Top Building in Nearby Suburbs

Find ranked building in suburbs close to Kingston.

Are You a Building in Kingston?

Get listed on TradeRefer and rank in the top building for Kingston. Free to join.

List Your Business Free
Last referral matched: Plumbing in Bondi 12 min ago