tradereferTRADEREFER
Ranked by Google Reviews

Top 10 Building
in Keilor, Melbourne

TradeRefer lists 3 building businesses in Keilor with an average Google rating of 4.2 across 73 reviews. The businesses below are ranked from highest to lowest rating — all ABN-checked and community-recommended.

Typical cost in Keilor: $80–$160/hr

Ranked #2026

By Google Rating

4.2★ Avg Rating

73 reviews

ABN Checked

ABN-checked

Top 3 Building in Keilor — Ranked by Rating

Sorted by public Google rating, highest first. All ABN-checked.

#1
Top Rated 2026
Urbanised Homes
Building ABN checked

Urbanised Homes

Truly contemporary melbourne home designs. Over the last 10 years our residential construction team has been specialising in new homes, custom homes, multi-unit developments and knock down & rebuilds.

5.0(13 reviews)
Keilor
#2
Building ABN checked

MI Building and Construction

MI Building and Construction is a highly rated building business serving Keilor East and surrounding areas in VIC. They hold a strong 4-star rating based on 4 customer reviews. Contact MI Building and Construction today — call +61 413 237 037 or visit their website for a free quote.

4.0(4 reviews)
Keilor East
#3
Building ABN checked

Luxton Homes

Welcome to Luxton Homes, a Melbourne residential building company with a long and successful history in property and land development.

3.6(56 reviews)
Keilor East

How Much Do Building Cost in Keilor?

Based on Victoria industry rates. Always get 2–3 written quotes.

Typical Range

$80–$160

/hr

After-Hours

$240

Emergency callout

Avg Hourly

$120

Keilor market

Estimates only. Always request a written quote before authorising work.

Building Licensing in Victoria

In Victoria, builders must be registered with the Victorian Building Authority (VBA). Work over $10,000 requires a Major Domestic Building Contract.

How to Choose the Best Building in Keilor

A checklist before hiring any building in Keilor, Melbourne.

  1. 1

    Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).

  2. 2

    Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.

  3. 3

    Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.

  4. 4

    Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.

  5. 5

    Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.

FAQs — Building in Keilor, Melbourne

How much does a home extension cost in Australia?

A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.

Do I need council approval for a home extension?

Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.

What is the difference between a builder and an architect?

An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.

How long does a granny flat take to build in Australia?

A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.

What should a building contract include?

A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.

Top Building in Nearby Suburbs

Find ranked building in suburbs close to Keilor.

Are You a Building in Keilor?

Get listed on TradeRefer and rank in the top building for Keilor. Free to join.

List Your Business Free
Last referral matched: Plumbing in Bondi 12 min ago