tradereferTRADEREFER
Ranked by Google Reviews

Top 10 Building
in Lalor, Melbourne

TradeRefer lists 4 building businesses in Lalor with an average Google rating of 4.7 across 228 reviews. The businesses below are ranked from highest to lowest rating — all ABN-checked and community-recommended.

Typical cost in Lalor: $80–$160/hr

Ranked #2026

By Google Rating

4.7★ Avg Rating

228 reviews

ABN Checked

ABN-checked

Top 4 Building in Lalor — Ranked by Rating

Sorted by public Google rating, highest first. All ABN-checked.

#1
Top Rated 2026
L.V.D GROUP | Building The Future
Building ABN checked

L.V.D GROUP | Building The Future

BUILDING THE FUTURE | MELBOURNE BUILDERS

5.0(120 reviews)
Lalor
#2
AMCON Homes
Building ABN checked

AMCON Homes

AMCON Homes delivers quality and stunning development results in the Home Garage Renovations, Bath and Outdoor Living Areas.

5.0(37 reviews)
Lalor
#3
Dulger Homes New Home Builder and New Home Designs
Building ABN checked

Dulger Homes New Home Builder and New Home Designs

Premier home designs with quality materials and full customisation. Review our range of houses and inclusions, or contact Dulger Homes to learn more.

4.7(63 reviews)
Lalor
#4
Multihomes
Building ABN checked

Multihomes

Multihomes is a highly rated building business serving Lalor and surrounding areas in NSW. They hold a strong 4-star rating based on 8 customer reviews. Contact Multihomes today — call +61 418 588 584 for a free quote.

4.0(8 reviews)
Lalor

How Much Do Building Cost in Lalor?

Based on Victoria industry rates. Always get 2–3 written quotes.

Typical Range

$80–$160

/hr

After-Hours

$240

Emergency callout

Avg Hourly

$120

Lalor market

Estimates only. Always request a written quote before authorising work.

Building Licensing in Victoria

In Victoria, builders must be registered with the Victorian Building Authority (VBA). Work over $10,000 requires a Major Domestic Building Contract.

How to Choose the Best Building in Lalor

A checklist before hiring any building in Lalor, Melbourne.

  1. 1

    Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).

  2. 2

    Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.

  3. 3

    Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.

  4. 4

    Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.

  5. 5

    Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.

FAQs — Building in Lalor, Melbourne

How much does a home extension cost in Australia?

A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.

Do I need council approval for a home extension?

Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.

What is the difference between a builder and an architect?

An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.

How long does a granny flat take to build in Australia?

A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.

What should a building contract include?

A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.

Top Building in Nearby Suburbs

Find ranked building in suburbs close to Lalor.

Are You a Building in Lalor?

Get listed on TradeRefer and rank in the top building for Lalor. Free to join.

List Your Business Free
Last referral matched: Plumbing in Bondi 12 min ago