Top 10 Building
in Balga, Perth
TradeRefer lists 5 building businesses in Balga with an average Google rating of 4.8★ across 258 reviews. The businesses below are ranked from highest to lowest rating — all ABN-checked and community-recommended.
Ranked #2026
By Google Rating
4.8★ Avg Rating
258 reviews
ABN Checked
ABN-checked
Top 5 Building in Balga — Ranked by Rating
Sorted by public Google rating, highest first. All ABN-checked.

Nulook Homes
At Nulook Homes we are committed to building quality homes to the highest of standards at an affordable price. Custom home builder, Perth, Western Australia.

Future First Homes
Future First Homes is a top-rated building business serving Balga, WA. With a 5-star rating from 21 reviews, they are one of the most trusted building providers in the area. Specialising in building and construction for new homes, renovations, and extensions, Future First Homes delivers quality workmanship and reliable service. Contact them today for a free quote.

Norde Homes
Custom home builder Norde Homes designs & builds passive solar design, passivhaus & energy-efficient custom homes tailored to your lifestyle.

First Homebuilders
Building your first home in Perth? First Home Builders offers a great experience for first homebuyers and first home builders with affordable new homes.

Mondo Exclusive Homes
Mondo Exclusive Homes is an award-winning Luxury Home Builder in Perth WA. Build with confidence with one of the best boutique Perth Builders.
How Much Do Building Cost in Balga?
Based on Western Australia industry rates. Always get 2–3 written quotes.
Typical Range
$80–$160
/hr
After-Hours
$240
Emergency callout
Avg Hourly
$120
Balga market
Estimates only. Always request a written quote before authorising work.
Building Licensing in Western Australia
In WA, builders must be registered with the Building Services Board. A home indemnity insurance is required for work over $20,000.
How to Choose the Best Building in Balga
A checklist before hiring any building in Balga, Perth.
- 1
Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).
- 2
Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.
- 3
Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.
- 4
Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.
- 5
Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.
FAQs — Building in Balga, Perth
How much does a home extension cost in Australia?
A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.
Do I need council approval for a home extension?
Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.
What is the difference between a builder and an architect?
An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.
How long does a granny flat take to build in Australia?
A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.
What should a building contract include?
A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.
Top Building in Nearby Suburbs
Find ranked building in suburbs close to Balga.
Are You a Building in Balga?
Get listed on TradeRefer and rank in the top building for Balga. Free to join.
List Your Business Free