Top 10 Building
in Greenwood, Perth
TradeRefer lists 4 verified building businesses in Greenwood with an average Google rating of 4.6★ across 50 reviews. The businesses below are ranked from highest to lowest rating — all ABN-verified and community-recommended.
Ranked #2026
By Google Rating
4.6★ Avg Rating
50 reviews
100% Verified
ABN-checked
Top 4 Building in Greenwood — Ranked by Rating
Sorted by verified Google rating, highest first. All ABN-verified.

Kano's Constructions
Kano's Constructions is a highly rated building business serving Greenwood and surrounding areas in WA. With an outstanding 5-star rating from 13 customer reviews, they are one of the top-rated building providers in the area. Contact Kano's Constructions today — call +61 421 413 273 for a free quote.

Caprice Constructions
Caprice Constructions is a highly rated building business serving Greenwood and surrounding areas in WA. With an outstanding 5-star rating from 6 customer reviews, they are one of the top-rated building providers in the area. Contact Caprice Constructions today — call +61 426 816 969 or visit their website for a free quote.

Colgan Industries Pty Ltd
Preserve your heritage project with Colgan Industries. We honor its past while enhancing its future. Partner with WA’s trusted heritage builder.

Nuchange Building
Nuchange Building is a professional building business serving Greenwood and surrounding areas in WA. Rated 3.8 stars from 21 reviews. Contact Nuchange Building today — call +61 8 9343 8850 or visit their website for a free quote.
How Much Do Building Cost in Greenwood?
Based on Western Australia industry rates. Always get 2–3 written quotes.
Typical Range
$80–$160
/hr
After-Hours
$240
Emergency callout
Avg Hourly
$120
Greenwood market
Estimates only. Always request a written quote before authorising work.
Building Licensing in Western Australia
In WA, builders must be registered with the Building Services Board. A home indemnity insurance is required for work over $20,000.
How to Choose the Best Building in Greenwood
A checklist before hiring any building in Greenwood, Perth.
- 1
Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).
- 2
Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.
- 3
Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.
- 4
Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.
- 5
Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.
FAQs — Building in Greenwood, Perth
How much does a home extension cost in Australia?
A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.
Do I need council approval for a home extension?
Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.
What is the difference between a builder and an architect?
An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.
How long does a granny flat take to build in Australia?
A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.
What should a building contract include?
A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.
Top Building in Nearby Suburbs
Find ranked building in suburbs close to Greenwood.
Are You a Building in Greenwood?
Get listed on TradeRefer and rank in the top building for Greenwood. Free to join.
List Your Business Free