tradereferTRADEREFER
Ranked by Google Reviews

Top 10 Demolition
in Aldinga Beach, Adelaide

TradeRefer lists 3 demolition businesses in Aldinga Beach with an average Google rating of 5.0 across 12 reviews. The businesses below are ranked from highest to lowest rating — all ABN-checked and community-recommended.

Typical cost in Aldinga Beach: $60–$120/hr

Ranked #2026

By Google Rating

5.0★ Avg Rating

12 reviews

ABN Checked

ABN-checked

Top 3 Demolition in Aldinga Beach — Ranked by Rating

Sorted by public Google rating, highest first. All ABN-checked.

#1
Top Rated 2026
Demolish and Construct Demolition logoDemolish and Construct Demolition
Demolition ABN checked

Demolish and Construct Demolition

Demolish And Construct Demolition - demolishandconstruct.com -small demolition - Wall removal & structural beam install - New doorway in brick walls - Termite damage removal - Ceiling removal - Concrete removal - Lean to removal - Commercial strip outs - Tile floor removal - Roof removal

5.0(3 reviews)
Aldinga Beach
#2
Hills and South Coast Demolition
Demolition ABN checked

Hills and South Coast Demolition

Expert demolition contractors servicing Adelaide Hills & South Coast. Full project management including council approvals & utility abolishments. 35+ years experience.

5.0(1 reviews)
Aldinga Beach
#3
AC Demolition
Demolition ABN checked

AC Demolition

Leading demolition contractors in Adelaide. Expert residential & commercial demolition, asbestos removal, and project management. 35+ years experience. Free quotes.

4.9(8 reviews)
Aldinga Beach

How Much Do Demolition Cost in Aldinga Beach?

Based on South Australia industry rates. Always get 2–3 written quotes.

Typical Range

$60–$120

/hr

After-Hours

$180

Emergency callout

Avg Hourly

$90

Aldinga Beach market

Estimates only. Always request a written quote before authorising work.

Demolition Licensing in South Australia

In SA, demolition requires a building licence for structural work. Asbestos removal must be performed by a licensed removalist under SafeWork SA regulations.

How to Choose the Best Demolition in Aldinga Beach

A checklist before hiring any demolition in Aldinga Beach, Adelaide.

  1. 1

    Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).

  2. 2

    Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.

  3. 3

    Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.

  4. 4

    Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.

  5. 5

    Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.

FAQs — Demolition in Aldinga Beach, Adelaide

How much does it cost to demolish a house in Australia?

House demolition typically costs $12,000–$30,000 for a standard 3-bedroom home. Costs depend on size, materials (asbestos adds 50–100% to cost), site access, and whether a pool, garage, or other structures are included.

Do I need a permit to demolish a building in Australia?

Yes — a demolition permit is required for most structures in all Australian states. Apply through your local council or relevant building authority. Heritage-listed properties and buildings in heritage overlays have additional restrictions and may require heritage impact assessments.

What happens to asbestos during demolition?

Any asbestos-containing materials must be identified by a licensed asbestos assessor before demolition begins. Class B (non-friable) asbestos can be removed by licensed class B removalists. Class A (friable) asbestos requires a specialist class A removalist. All asbestos waste must go to a licenced disposal facility.

How long does a house demolition take?

Demolition of a standard house takes 1–5 days depending on size and method. Asbestos removal adds time. Site clearing, including foundation removal, typically takes 1–2 additional days. Total project duration including approvals can be 2–6 weeks.

Can I salvage materials before demolition?

Yes — and it can save significantly on disposal costs. Timber, bricks, roofing tiles, doors, windows, and plumbing fixtures can often be sold or donated. Discuss salvage with your demolition contractor upfront. Some specialist deconstruction companies offer near-complete salvage services.

Are You a Demolition in Aldinga Beach?

Get listed on TradeRefer and rank in the top demolition for Aldinga Beach. Free to join.

List Your Business Free