tradereferTRADEREFER

Bianco Precast 535 Grand Jct Rd, Gepps Cross SA 5094 — Concreting in Gepps Cross

Concreting Verified
4.8 (12)
Gepps Cross, SA
Bianco Precast 535 Grand Jct Rd, Gepps Cross SA 5094 cover
Bianco Precast 535 Grand Jct Rd, Gepps Cross SA 5094
Concreting Verified

Bianco Precast 535 Grand Jct Rd, Gepps Cross SA 5094

4.8(12)
Gepps CrossSA
Member since 2026

Contact & Location

Location

Own this business?

Claim your free profile →

No lead fees
Pay only when you win
ABN verified

About the Business

Looking for bianco precast 535 grand jct rd 5094 in Gepps Cross? Bianco Precast 535 Grand Jct Rd, Gepps Cross SA 5094 helps customers in Gepps Cross, Adelaide, SA compare options, review completed work, and request free quotes for corporate office.

Bianco Precast 535 Grand Jct Rd, Gepps Cross SA 5094 brings servicing jobs within 20 km to customers across Gepps Cross, Adelaide, SA.

Bianco Precast 535 Grand Jct Rd, Gepps Cross SA 5094 is a top-rated concreting business serving Gepps Cross, SA. With a 4.8-star rating from 12 reviews, they are one of the most trusted concreting providers in the area. Specialising in concreting for driveways, paths, slabs, and decorative finishes, Bianco Precast 535 Grand Jct Rd, Gepps Cross SA 5094 delivers quality workmanship and reliable service. Contact them today for a free quote.

Expertise & Services

Services include Corporate Office. Compare quotes, review past work and connect with this business through TradeRefer.

Corporate Office

Trust & Reliability

4.8

TradeRefer Score

Rating

12 reviews

0

Connections

Frequently Asked Questions

General Concreting questions for Gepps Cross

How much does a concrete driveway cost in Australia?

A standard concrete driveway costs $65–$150/m² depending on thickness, reinforcement, finish, and location. A double driveway of ~50m² typically costs $3,500–$7,500. Exposed aggregate and decorative finishes cost more than plain broom-finished concrete.

How thick should a concrete slab be for a driveway?

Residential driveways should be a minimum 100mm (4 inches) thick with SL72 or SL82 mesh reinforcement. For areas with heavy vehicles or truck access, 125–150mm with rebar reinforcement is recommended. Thicker slabs are needed for reactive soils.

How long does concrete take to cure?

Concrete reaches about 70% strength in 7 days and full strength at 28 days. Light foot traffic can resume after 24–48 hours. Vehicles should wait at least 7 days. In cold weather, curing slows significantly — your concretor may use curing compounds or covers.

What is exposed aggregate concrete?

Exposed aggregate concrete has the top layer of cement paste removed (by washing) to reveal the stones within the mix. It's popular for driveways, paths, and pool surrounds as it provides a decorative finish with natural slip resistance. It costs 15–25% more than plain concrete.

Why does concrete crack?

All concrete eventually cracks due to shrinkage, thermal movement, or ground movement. Control joints are deliberately placed every 3–4 metres to direct cracking. Cracks wider than 3mm or that are heaving or sinking indicate a structural issue requiring assessment.

Get a Free Quote

Expect a response within 24 hours.

Refer & Earn

Know someone who needs Concreting services? Refer Bianco Precast 535 Grand Jct Rd, Gepps Cross SA 5094 and earn a reward when the job closes.

Referral reward$8
Apply to Refer