tradereferTRADEREFER
Ranked by Google Reviews

Top 10 Building
in Burns Beach, Perth

TradeRefer lists 3 building businesses in Burns Beach with an average Google rating of 4.8 across 52 reviews. The businesses below are ranked from highest to lowest rating — all ABN-checked and community-recommended.

Typical cost in Burns Beach: $80–$160/hr

Ranked #2026

By Google Rating

4.8★ Avg Rating

52 reviews

ABN Checked

ABN-checked

Top 3 Building in Burns Beach — Ranked by Rating

Sorted by public Google rating, highest first. All ABN-checked.

#1
Top Rated 2026
Coast Homes WA
Building ABN checked

Coast Homes WA

Coast Homes are your leading custom home builders in Perth. Get in touch today to see how our boutique home builders in Perth can help build your next dream home.

5.0(35 reviews)
Burns Beach
#2
Building ABN checked

Select Homes

Select Homes offers building and construction for new homes, renovations, and extensions in Burns Beach, WA. With 3 customer reviews and a focus on quality workmanship, they serve homes and businesses across the Burns Beach area. Contact Select Homes for a free quote.

5.0(3 reviews)
Burns Beach
#3
Burns Beach Sales and Information Centre - Peet
Building ABN checked

Burns Beach Sales and Information Centre - Peet

Explore the stunning community of Burns Beach. Enquire about houses and land for sale in Burns Beach Estate today.

4.3(14 reviews)
Burns Beach

How Much Do Building Cost in Burns Beach?

Based on Western Australia industry rates. Always get 2–3 written quotes.

Typical Range

$80–$160

/hr

After-Hours

$240

Emergency callout

Avg Hourly

$120

Burns Beach market

Estimates only. Always request a written quote before authorising work.

Building Licensing in Western Australia

In WA, builders must be registered with the Building Services Board. A home indemnity insurance is required for work over $20,000.

How to Choose the Best Building in Burns Beach

A checklist before hiring any building in Burns Beach, Perth.

  1. 1

    Verify their electrical licence is current at your state's electrical safety authority (e.g. Energy Safe Victoria, NSW Fair Trading).

  2. 2

    Confirm they carry public liability insurance of at least $5 million — ask to see the certificate.

  3. 3

    Get 2–3 written quotes for any job over $500. A written quote protects both parties and clarifies the full scope.

  4. 4

    Check their Google and TradeRefer ratings — look for consistent reviews mentioning punctuality, clean workmanship, and clear communication.

  5. 5

    Ask whether they'll provide a Certificate of Compliance (electrical safety certificate) on completion, as required by law in most states.

FAQs — Building in Burns Beach, Perth

How much does a home extension cost in Australia?

A single-storey extension typically costs $2,000–$3,500 per m². A 40m² addition runs $80,000–$140,000 including structural work, roofing, cladding, and fit-out. Two-storey additions cost more due to engineering and structural complexity. Always get a fixed-price contract rather than a cost-plus arrangement.

Do I need council approval for a home extension?

Yes in most cases. Extensions that change the building's footprint, height, or floor area require a building permit and often a planning permit. Some minor works fall under 'exempt development' thresholds — these vary by state and council. Your builder or building designer can advise what approvals apply to your project.

What is the difference between a builder and an architect?

An architect designs the building and may project-manage, but doesn't do physical construction. A builder constructs the project to approved plans. A building designer (draftsperson) produces plans without an architect's full qualification. For most residential projects, a building designer plus licensed builder is sufficient and more cost-effective.

How long does a granny flat take to build in Australia?

A standard prefabricated or modular granny flat takes 12–20 weeks from approval to completion. Traditionally-built granny flats take 16–26 weeks. The approval process (council or CDC) takes 4–10 weeks before construction can begin. Total time from concept to move-in is typically 6–12 months.

What should a building contract include?

A compliant building contract must include: fixed price or schedule of rates, scope of works, start and completion dates, progress payment schedule, insurance details, the builder's licence number, variation process, and dispute resolution procedure. Never pay more than 10% deposit in most states.

Top Building in Nearby Suburbs

Find ranked building in suburbs close to Burns Beach.

Are You a Building in Burns Beach?

Get listed on TradeRefer and rank in the top building for Burns Beach. Free to join.

List Your Business Free
Last referral matched: Plumbing in Bondi 12 min ago